GPUTraceCriticalPath
Overview​
GPUTraceCriticalPath performs exact duration-weighted analysis over a trace's canonical parent
forest. It keeps source identity intact and publishes ordinary graph views that renderers,
filters, aggregations, and readback rings can consume without translating results through CPU
objects.
At a glance
| Question | Answer |
|---|---|
| Problem | Find exact duration-weighted critical paths in the canonical trace parent forest. |
| Reads / writes | Reads parents and durations; writes cumulative duration, critical predecessors, path mask, and diagnostics. |
| Ownership | Public inputs and outputs are caller-owned; scratch storage is graph-owned transient memory. |
| Output contract | Exact selected path under the documented forest model, with cycle and invalid-parent reporting. |
| Expected work | Logarithmic pointer-jumping rounds plus bounded endpoint selection and path publication. |
| Chunks | Canonical span IDs remain stable across partitions. |
| Conditions / budgets | May be spread across frame-budgeted steps for full-trace analysis. |
| Neighborhood | trace parent forest → GPUTraceCriticalPath → focus mask, labels, and aggregation. |
When to use​
Use this contributor when a trace has one canonical parent per span and the application needs the longest parent chain, per-span slack, or a critical-path mask. Use a dependency-DAG analysis instead when spans may have several causal predecessors.
Usage​
import {GPUTraceCriticalPath} from '@luma.gl/graph/gpu-trace';
new GPUTraceCriticalPath({
parentIndices,
durations,
maximumRowsPerPass: 262_144,
output: {
pathDurations,
slackDurations,
criticalPredecessors,
rootIndices,
hopCounts,
criticalMask,
summary
}
}).addToGraph(graph);
Inputs and outputs​
| View | Meaning |
|---|---|
pathDurations | Inclusive duration from each span through its canonical parents |
slackDurations | Winning duration minus the row's valid parent-path duration |
criticalPredecessors | Validated parent identity or 0xffffffff |
rootIndices | Resolved root identity or 0xffffffff for cyclic rows |
hopCounts | Parent-edge distance to the root |
criticalMask | One for spans on the selected longest path |
summary[0] | Maximum duration encoded as positive f32 bits |
summary[1] | Lowest stable endpoint attaining that duration |
summary[2] | Maximum resolved hop count |
summary[3] | Validation and incomplete-result flags |
Execution and ownership​
The contributor initializes one compact state record per span and then uses pointer jumping to
resolve every parent chain in ceil(log2(spanCount)) + 1 passes. Each pass doubles the resolved
ancestor distance. Valid rows publish their root, hop count, and inclusive cumulative duration.
The maximum duration is selected on the GPU, ties choose the lowest canonical endpoint index, and
one bounded walk marks the exact winning path.
No submission or readback occurs inside the contributor. Scratch state is graph-owned and may be transiently allocated; all public outputs remain caller-owned.
Every pass publishes a static invocation bound. A caller can therefore use
compiled.createExecution({maximumInvocationCount}) to submit dependency-ordered pieces over
multiple frames. maximumRowsPerPass optionally divides initialization, pointer-jump,
finalization, endpoint, and slack work into smaller graph nodes when an application needs a hard
per-submission row bound. Leaving it unset minimizes pipeline count; setting it trades additional
compiled nodes for finer queue scheduling.
Capacity, validation, and failure behavior​
The summary flags distinguish invalid parents, invalid durations, cycles, numeric overflow, and a
critical path that exceeded maximumCriticalPathLength. Invalid or cyclic parent chains cannot
win endpoint selection. Applications can expose these flags directly in graph diagnostics instead
of presenting a silent partial result.
Limitations​
This contract is exact for one canonical parent per span. It deliberately does not pretend that a parent forest is a general dependency DAG: multi-parent topological preparation, full CPM earliest and latest times, and dependency-level wait attribution are the next causal-analysis layer. The stable outputs here are designed to feed that extension without changing canonical span identity.